# EIA Power Project Monitor — workflow

## Choose this tool

Build a focused research list from EIA's official planned-generator table. Review the published entity, technology, capacity, project status and scheduled operation month, then compare later observations with your saved baseline. Useful for equipment sales research, engineering teams and project development watchlists.

Useful output columns: `plantId`, `generatorId`, `plantName`, `entityName`, `state`, `technology`.

## Practical workflow

Copy this input into Console's JSON editor. It selects up to 100 matching source entries and saves at most five generator observations. No API key, login or proxy subscription is required.

```json
{
  "states": [
    "TX"
  ],
  "maxSourceEntries": 100,
  "maxResults": 5
}
```

Open **Saved observations** or **CSV export** for the data, then **Run report** for counts and coverage. Check `reportingMonth` and `sourcePublishedDate` before using a row. Empty input reads the same official table and saves up to five rows across the unfiltered sample.

## Check the fit

The source is [EIA Electric Power Monthly, Table 6.5](https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_6_05), based on EIA-860/EIA-860M reporting. It excludes facilities with total generator nameplate capacity below 1 MW and covers planned additions, rather than a full operating/retired/cancelled catalog or interconnection queue.

The retained sample reported **July 2026 data released September 24, 2026**. Each run preserves the dates supplied by its response; the run date never replaces the reporting period. Preliminary reports can be revised, and a schedule/status change may be a correction. Verify consequential project decisions with current official records and the sponsor.

[EIA permits reuse of public-domain data with source and publication-date attribution](https://www.eia.gov/about/copyrights_reuse.php). This independent Actor is not endorsed by EIA and does not use its logo.

## Real output sample

One selected row from a 2026-10-17 run. One saved row, selected scalar columns only. Contact details, patient demographics and long text are omitted. Original values and nulls are preserved.

Run: szFwKgjMABXybn0f9. Summary status: ok. Incomplete: false.

Historical output from this run; the current example input is a separate starting configuration and may produce different records.

```json
{
  "plantId": "56",
  "generatorId": "LEC3",
  "plantName": "Lowman Energy Center",
  "entityName": "PowerSouth Energy Cooperative",
  "state": "AL",
  "technology": "Natural Gas Fired Combustion Turbine",
  "status": "(L) Regulatory approvals pending. Not under construction",
  "plannedOperationMonth": "2029-11",
  "nameplateCapacityMw": 438,
  "sourceUrl": "https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_6_05",
  "observedAt": "2026-10-17T16:32:00.411Z"
}
```

## Combine with companion tools

Each Actor runs separately with its own inputs, authorization and pricing. These instructions do not configure automatic execution.

### [US Building Permits Scraper - 10 Cities, One Schema](https://mayd-it.com/data-tools/actors/us-building-permits-scraper/)

Scrape US building permits from 10 city open-data portals into one clean schema. Contractor and applicant leads with address, valuation, and dates. Filter and export to CSV. Keep this US Building Permits Scraper evidence alongside the original source in a reviewed infrastructure research workflow.

1. Choose the corresponding source target in this second Actor’s own input form; no automatic field transfer is configured.
2. Keep both original source URLs and observation dates in your review sheet; reconcile identities manually.

A published milestone, application or project listing does not establish construction completion, available capacity or investability. Match official project evidence and dates.

### [Federal Infrastructure Milestone Monitor](https://mayd-it.com/data-tools/actors/federal-infrastructure-milestone-monitor/)

Track official federal infrastructure review milestones, published target dates and saved changes. Filter mining, power and industrial projects; no API key required. Keep this Federal Infrastructure Milestone Monitor evidence alongside the original source in a reviewed infrastructure research workflow.

1. Choose the corresponding source target in this second Actor’s own input form; no automatic field transfer is configured.
2. Keep both original source URLs and observation dates in your review sheet; reconcile identities manually.

A published milestone, application or project listing does not establish construction completion, available capacity or investability. Match official project evidence and dates.